Notice is hereby given to all mariners and other parties concerned that:
1. Reference: Letter from Mr. Arnel Quabael Operation Officer, Port Agency Services, BEN LINE Agencies Phils. Inc. dated October 26, 2015.
2. The GLOBAL MARINE SYSTEMS, LTD thru vessel CS Cable Retriever has been tasked to do Cable repair for ASE-ASIA SUBMARINE CABLE EXPRESS between 18 degs 50.4 mins North and 18 degs 43.79 mins north, 121 degs 48.02 East near Camiguin Island, part of Babuyan Group of Island. Repair work is expected to commence on November 05, 2015 and estimated to be completed on December 01, 2015 on areas bounded by the following coordinates:
ASE (Asia Submarine Cable Express) Segment 1.3 Cable Working Area
Event | Latitude | Longitude |
Fault Location | 08 degs 46.3792 mins North | 121 degs 53.7446 mins East |
18 degs 44.03 mins North | 121 degs 49.37 mins East | |
18 degs 44.01 mins North | 121 degs 50.32 mins East | |
18 degs 44.91 mins North | 121 degs 52.13 mins East | |
18 degs 46.19 mins North | 121 degs 52.47 mins East | |
18 degs 48.55 mins North | 121 degs 58.97 mins East | |
18 degs 48.04 mins North | 121 degs 59.17 mins East | |
18 degs 45.79 mins North | 121 degs 52.92 mins East | |
18 degs 44.47 mins North | 121 degs 52.61 mins East | |
18 degs 43.47 mins North | 121 degs 50.45 mins East | |
18 degs 43.48 mins North | 121 degs 49.36 mins East |
3. In this connection, all ships/watercrafts transiting along the routes of above mentioned destinations are advised to observe safe distance from the vessel and take necessary precautionary measures at all times.
4. The cooperation of all concerned in effecting the widest dissemination of this information is requested.