Notice is hereby given to all mariners and other parties concerned that:
1. Reference: Radio Message from Acting Commander, Coast Guard District National Capital Region-Central Luzon.
2. Above reference pertains to the Forthcoming implementation for the two China Aid Bridge project (BINONDO-INTRAMUROS BRIDGE and ESTRELLA-PANTALEON BRIDGE) that will be financed by the Government of the people’s republic of China through Bilateral Cooperation these two (2) flagship projects are parts of the Administration’s “BUIL,BUILD,BUILD” Program that will start from July 2018 to December 2018. The area of activity is bounded by the following coordinates:
INCLUSIVE DATES |
AREA OF COVERAGE |
COORDINATES |
FROM JULY 2018 TO DECEMBER 2018 |
VICINITY OF BINONDO-INTRAMUROS MANILA ALONG PASIG RIVER |
LAT 14°35’45.22”N LONG 120°58’30.15”E LAT 14°35’45.20”N LONG 120°58’30.15”E LAT 14°35’41.20”N LONG 120°58’28.78”E LAT 14°35’41.41”N LONG 120°58’30.28”E |
-DO- |
ESTRELLA-PANTALEON BRIDGE MANDALUYONG, MAKATI CITY |
LAT 14°34’1.52”N LONG 121°2’15.14”E LAT 14°34’1.60”N LONG 121°2’15.56”E LAT 14°34’3.70”N LONG 121°2’15.10E LAT 14°34’3.61”N LONG 121°2’14.67”E |
3. In this connection, all ships/watercrafts transiting the vicinity of the abovementioned areas are advised to take note of the information and take necessary precautionary measures at all times.
4. The cooperation of all concerned in effecting widest dissemination of this information is requested.