Notice is hereby given to all mariners and other parties concerned that:
1. Reference: Letter from Mr Arnel Quibael, Assistant Operation Manager Port Agency Services Benline Agencies Philippines, Inc.
2. The EGS ASIA LTD will conduct cable route studies to redesign on South East Asia to Japan Cable System (SJC) in Northern Luzon from 01 June 2018 and estimate to complete on 30 June 2018 bounded with the following coordinates:
Segment 13 Reroute
Option 1
POS. NO |
EVENT |
LATITUDE |
LONGTITUDE |
1 |
AC |
20°21’49.02”N |
124°21’58.08”E |
2 |
CX |
20°25’11.46”N |
124°09’3.48”E |
3 |
AC |
20°28’22.8”N |
123°56’51.06”E |
4 |
CX |
20°28’47.10”N |
123°40’12.78”E |
5 |
CX |
20°28’47.10”N |
123°10’12.06”E |
6 |
AC |
20°29’5.88”N |
123°27’20.82”E |
7 |
POL |
20°28’57.42”N |
123°18’54.06”E |
8 |
CX |
20°28’53.88”N |
123°15’21.78”E |
9 |
AC |
20°28’51.48”N |
123°12’57.48”E |
10 |
CX |
20°25’30.48”N |
123°06’9.3”E |
11 |
AC |
20°24’23.46”N |
123°03’53.22”E |
12 |
AC |
20°15’38.76’N |
123°57’25.74’E |
Segment 13 Route
Option 2
POS. NO |
EVENT |
LATITUDE |
LONGTITUDE |
1 |
AC |
19°54’12.6”N |
123°44’1.86”E |
2 |
AC |
20°02’6”N |
123°34’44.22”E |
3 |
POL |
20°05’58.02”N |
123°30’29.1”E |
4 |
CX |
20°07’5.04”N |
123°29’15.42”E |
5 |
AC |
20°08’46.92”N |
123°27’23.46”E |
3. In this connection, all ships/watercrafts transiting the vicinity of the above-mentioned areas are advised to take note of the information and take necessary precautionary measures at .all times.
4. The cooperation of all concerned in effecting the widest dissemination of this information is requested.