Notice is hereby given to all mariners and other parties concerned that:

1.         Reference: Radio Message from Acting Commander, Coast Guard District National Capital Region-Central Luzon.

2.         Per above reference pertains to the request letter of Mr Lope Arnel M Evangelista, Stragerphil Site Geotechnical Operations Coordinator for DPWH-Katahira & Engineers International regarding the design project for Metro Manila Skyway Stage 3 Upgrade (MMSS3U) under DPWH and Katahira & Engineers International that they will have to conduct soil drilling activity near the pier if Delpan Bridge crossing the water ways with the following coordinates: 

INCLUSIVE DATES

AREA OF COVERAGE

COORDINATES

06 TO 12 SEPTEMBER 2018

DELPAN BRIDGE

(BOREHOLE NR 1)

LAT 14° 35’ 46” N LONG 120° 58’ 01”E

13 TO 20 SEPTEMBER 2018

DELPAN BRIDGE

(BOREHOLE NR 2)

LAT 14° 35’ 44” N LONG 120° 58’ 02”E

3.         In this connection, all ships/watercrafts transiting the vicinity of the abovementioned areas are advised to take note of the information and take necessary precautionary measures at all times.

4.        The cooperation of all concerned in effecting widest dissemination of this information is requested.