Notice is hereby given to all mariners and other parties concerned that:

1. Reference: Letter from Mr. CE Janvier Patrick F. Rosete, Operations Manager- Offshore, Ben Line Agencies Philippines Inc. dated 19 January 2022.

2. DP-2 Cable-laying vessel “FENG HUA 21” owned by FH Offshore Engineering Equipment CO., LTD. will conduct cable laying work for PLDT home fiber from 21 January 2022 until 18 March 2022 bounded by the following coordinates:

Segment

Name

BMH

Latitude

Longitude

29b

Coron

12°05.787’ N

120°18.560’E

Bubog

12°22.290’ N

121°01.886’E

26b

Dipolog

08°35.109’ N

123°20.192’E

Zamboanguita

09°05’ 51.12” N

123°12’10.62”E

25b

Cangmating

09°20.888’ N

123°18.091’E

Boljoon

09°37.453’ N

123°28.829’E

3. In this connection, all ships/watercrafts transiting on the above-mentioned areas on the said date are advised to take note of the information and take precautionary measures at all times.

4. The cooperation of all concerned in effecting widest dissemination of this information is highly requested.