Notice is hereby given to all mariners and other parties concerned that:

1. Reference: Letter from Acting Commander, Coast Guard National Central Luzon – Central Luzon, dated 14 February 2019.

2. Pertains to the above reference, the Olympic Engineering and Sales Corp. the sub-contractor of First Balfour INC., for the supply and installation of replacement fender panel and pads on existing LRT 1 along Pasig River. The said activity is bounded by the following coordinates:

INCLUSIVE DATES

AREA OF COVERAGE

COORDINATES

 From February – April 2019

 Vicinity River of McArthur Bridge along Lawton-      Sta Cruz

Fender A P641-     LAT 14° 35’ 48.5” N LONG 120° 58’51.2”E

Fender  B P640- LAT 14° 35’ 47.6” N LONG 120° 58’ 51.1”E

 3. In this connection, all ships/watercrafts transiting the vicinity of the above mentioned areas are advised to take note of the information and take necessary precautionary measures at all times.  

4. The cooperation of all concerned in effecting widest dissemination of this information is requested.