Notice is hereby given to all mariners and other parties concerned that:
1. Reference: Letter from Ms. Ruth F Musa, Project Manager- Offshore, Ben Line Agencies Philippines Inc. dated 10 February 2022
2. Flat Top Barge “MSP 2” owned by Boskalis Westminister Shipping B. V and operated by Boskalis Philippines Inc. will be utilized for the dredging and land reclamation at Manila Bay prior to the Harbor Reclamation Project. The said vessel arrived on 24 December 2021 and start her work on 09 February 2022 until 09 August 2022 bounded by the following coordinates:
Coordinates of Project Exclusion Zone and demarcation buoy before closure of operational navigational channel to Port of Manila
POINT |
LATITUDE |
LONGITUDE |
1 |
14°31’57.82”N |
120°53’40.07”E |
2 |
14°33’33.60”N |
120°56’56.48”E |
3 |
14°32’32.87”N |
120°58’08.33”E |
4 |
14°33’04.29”N |
120°58’08.59”E |
5 |
14°32’47.93”N |
120°57’33.73”E |
6 |
14°32’26.22”N |
120°56’47.46”E |
7 |
14°32’08.47”N |
120°56’09.63”E |
8 |
14°32’11.16”N |
120°55’51.12”E |
9 |
14°32’24.74”N |
120°55’57.79”E |
10 |
14°32’45.65”N |
120°56’15.61”E |
11 |
14°33’09.63”N |
120°56’36.05”E |
Coordinates of Project Exclusion Zone and demarcation buoy after closure of operational navigational channel to Port of Manila
POINT |
LATITUDE |
LONGITUDE |
1 |
14°31’57.82”N |
120°53’40.07”E |
2 |
14°31’34.171”N |
120°56’55.908”E |
3 |
14°33’32.356”N |
120°58’07.595”E |
4 |
14°33’04.29”N |
120°58’08.59”E |
5 |
14°32’47.93”N |
120°57’33.73”E |
6 |
14°32’25.766”N |
120°56’47.175”E |
7 |
14°32’08.305”N |
120°56’09.013”E |
8 |
14°32’10.793”N |
120°55’50.470”E |
9 |
14°32’24.525”N |
120°55’56.326”E |
10 |
14°32’45.986”N |
120°56’15.328”E |
11 |
14°33’09.501”N |
120°56’35.452”E |
3. In this connection, all ships/watercrafts transiting on the above-mentioned areas on the said date are advised to take note of the information and take precautionary measures at all times.
4. The cooperation of all concerned in effecting widest dissemination of this information is highly requested.