MENU

 Notice is hereby given to all mariners and other parties concerned that:

1. Reference: Letter from Commander, Coast Guard District National Capital Region Central Luzon dated 11 February 2022

2. G.F Fabian Construction will conduct Construction of Walkway Bridge/ Hanging Bridge Over Pasig River at Sta. Ana Market Barangay 900 Punta, Sta. Ana, Manila on February 2022 until August 2022 bounded by the following coordinates:

INCLUSIVE DATES

AREA OF COVERAGE

COORDINATES

 

 

 

 

 

February 2022 until August 2022

 

 

 

 

 

 

 

 

 

Vicinity water of Punta, Sta Ana, Manila along Pasig River

POINT 1 Lat 14°34’56.95” N, Long 121°0’42.29” E

POINT 2 Lat 14°34’57.01” N, Long 121°0’42.42” E

POINT 3 Lat 14°34’57.24” N, Long 121°0’42.18” E

POINT 4 Lat 14°34’57.28” N, Long 121°0’42.34” E

POINT 5 Lat 14°34’58.57” N, Long 121°0’41.28” E

3. In this connection, all ships/watercrafts transiting on the above-mentioned areas on the said date are advised to take note of the information and take precautionary measures at all times.

4. The cooperation of all concerned in effecting widest dissemination of this information is highly requested.