MENU
×

Warning

JUser: :_load: Unable to load user with ID: 325

Notice is hereby given to all mariners and other parties concerned that:
  
1. Reference: Letter from Mr. Robert J. Goold General Manager of Logistic/Marketing Inc. dated May 17, 2016.

2. Fugro Survey Pte Ltd. (FUGRO), have been contracted to undertake Cable Route Survey works in Babuyan Channel, South of Camiguin Island.

3. The “MV FUGRO EQUINOX” operated by FUGRO will be deployed as survey vessel in the above mentioned location starting May 25, 2016 for approximately Two (2) to three (3) weeks sea if weather permitting. Coordinates below are the survey areas:

Point Latitude Longitude
1.0 121° 50.4’ East 18° 43.7’ North
2.0 122° 02.00’ East 18° 48.4’ North

3. In this connection, all ships/watercrafts transiting the vicinity of the above-mentioned areas are advice to take note on the information that the MV Fugro Equinox shall have restricted maneuverability during operational deployment and take precautionary measures at all times. To avoid any maritime incident and to remind all vessels to take extra precautionary measures at all times.

4. The cooperation of all concerned in effecting widest dissemination of this information is requested.