MENU

Notice is hereby given to all mariners and other parties concerned that:

1. Reference: Letter from Commander, Coast Guard District NCR-Central Luzon dated 21 January 2022 

2. The San Miguel Aerocity Inc., appointed contractor, Boskalis Philippines Inc. requesting for the extension of the validity of approved NOTAM 193-2021, NOTAM 332-2021 and NOTAM 392-2021. Said NOTAMs pertain to the Environmental Monitoring Buoys currently installed in Manila Bay, specifically in the municipal waters of Bulacan and Cavite for the Manila International Airport Project of the Government. These buoys need to be deployed until the end of December 2024 or until the end of the Land Development works bounded by the following coordinates:

INCLUSIVE DATES 

AREA OF COVERAGE

COORDINATES

 

NOTAM 193-2021

 

31 January 2022 -31 December 2024

Vicinity waters of Bulakan, Bulacan

 

BUOY A1

    Lat     14° 42’ 40.300" N, Long 120°48’19.913" E

BUOY A2 (New Location)

    Lat     14° 41’32.965" NLong 120°50’13.252" E

BUOY B

    Lat     14° 43’26.411" NLong 120°44’41.456" E

BUOY S

     Lat     14° 45’12.210" NLong 120°50’2.143" E

BUOY RB

     Lat      14° 45’14.221" N, Long 120°53’58.276" E

BUOY R1

     Lat      14° 41’19.082" N, Long 120°53’17.094" E

 

NOTAM 332-2021

 

31 January 2022 -31 December 2024

San Nicolas Shoal (SNS) sand sourcing area in the coastal waters of Cavite Province

BAB

     Lat 14°29'49.815"N, Long 120°51'51.532"E

BA1

     Lat 14°27'23.663"N, Long 120°49'23.765"E

BA2

     Lat 14°19'57.700"N, Long 120°41'38.709"E

 

NOTAM 392-2021

 

31 January 2022 -31 December 2024

MEYCAUAYAN RIVER BULACAN

BUOY R1

    Lat     14°  40’ 41.45" N, Long 120° 52’ 44.76" E

3. In this connection, all ships/watercrafts transiting on the above-mentioned areas on the said date are advised to take note of the information and take precautionary measures at all times.

4. The cooperation of all concerned in effecting widest dissemination of this information is requested.