MENU

Notice is hereby given to all mariners and other parties concerned that:

1. Reference: Radio Message from Acting Commander, Coast Guard District National Capital Region - Central Luzon dated 08 May 2019.

2. Per above reference, the Geotechnical Investigation of Metro Manila Subway project along Pasig River, the PR-2 Borehole drilling were already finished and they will move and start on the last PR-1 Borehole drilling. The project of Soil Philippines Index Testing Inc. with office address 441 Real St. corner Perpetual Village 2, Pulang Lupa 1, Las Piñas City is bounded by the following coordinates:

INCLUSIVE DATES

AREAS OF COVERAGE

COORDINATES

 

06 May to 15 June 2019

 

Vicinity off Pasig River, Brgy West Rembo, Makati and Brgy Penida Pasig City

 

PR – 1: Lat 14°33’54.75’’ N

             Long 121°3’29.70’’ E

 

3. In this connection, all ships/watercrafts transiting the vicinity of above mentioned areas are advised to take note of the information and take necessary precautionary measures at all times.  

4. The cooperation of all concerned in effecting widest dissemination of this information is requested.

Notice is hereby given to all mariners and other parties concerned that:

1. Reference: Message from Acting Commander, Coast Guard District Southern Tagalog dated 03 May 2019.

2. LS MAINAGA located at Brgy Mainaga, Mabini Batangas or at Lat 13° 46’ 24” North Longitude 120° 57’ 18” East with light characteristic of flashing green every five (5) seconds REPORTED OPERATING as of 24 April 2019.

3. In this connection, all ships/watercrafts transiting vicinity of abovementioned areas and said dates are advised to take note of information and take necessary precautionary measures at all times.

4. The cooperation of all concerned in effecting widest dissemination of this information is requested.

Notice is hereby given to all mariners and other parties concerned that:

1. Reference: Message from Acting Commander, Coast Guard District National Capital Region - Central Luzon dated 02 May 2019.

INCLUSIVE DATES

AREAS OF COVERAGE

COORDINATES

 

10 April to 15 May 2019

 

Vicinity off Pasig River, Brgy West Rembo, Makati and Brgy Penida Pasig City

 

PR - 2:Lat 14°35’56.73’’ N, Long 121°4’56.16’’ E

 

2. Per above reference, the Geotechnical Investigation of Metro Manila Subway project along Pasig River, were caused delay of drilling and currently on-going at about 50 meters was not yet hit the target bedrock. The Soil Philippines Index Testing Inc. with office address 441 Real St. corner Perpetual Village 2, Pulang Lupa 1, Las Piñas City is requesting for extension of the said project bounded by the following coordinates:

3. In this connection, all ships/watercrafts transiting the vicinity of the above mentioned areas are advised to take note of the information and take necessary precautionary measures at all times.

4. The cooperation of all concerned in effecting widest dissemination of this information is requested.

Notice is hereby given to all mariners and other parties concerned that:

1. Reference: Philippine Navy Radio Message Cite NOCB-0519-014 dated 06 May 2019.

2. Per above reference, the project completion of the weapons upgrade of JCPV’s, BRP EMILIO JACINTO (PS35) and BRP APOLINARIO MABINI (PS36) will conduct their firing trials as part of Sea Acceptance Test (SAT) of the JCPV Phase 3A and 3B upgrade project on dates and maritime areas bounded by the following coordinates:

VESSEL

DATE

VICINITY

COORDINATES

PS35

08 May 19

(Primary)

 

09 to 10 May 19

(Alternate)

 

14 to 15 May 19

(Alternate)

 

15.6 NM SW OFF GUAY POINT, MARIVELES, BATAAN

PT A –   LAT 14°21.00’ N, LONG 120°09.20’ E

 

PT B –   LAT 14°21.00’ N, LONG 119°59.00’ E

 

PT C –   LAT 14°11.00’ N, LONG 119°59.00’ E

 

PT D –   LAT 14°11.00’ N, LONG 120°09.20’ E

 

PS36

 

16-17 May 19

3. In this connection, all ships/watercrafts transiting the vicinity of the above mentioned areas on the said date are advised to take note of the information and take necessary precautionary measures at all times.

4. The cooperation of all concerned in effecting widest dissemination of this information is requested.