MENU
×

Warning

JUser: :_load: Unable to load user with ID: 325

Notice is hereby given to all mariners and other parties concerned that:

1. Reference: Letter from Mr. Arnel Quabael Operations-Port Agency Services, BENLINE Agencies Phils. Inc. dated February 22, 2016.

2. The GLOBAL MARINE SYSTEMS, LTD thru vessel CS Cable Retriever has been tasked to do Cable repair for ASE-ASIA SUBMARINE CABLE EXPRESS Segment 1. 3, 1.4 and segment 4 west of Ilocos Norte. The Job will be extend from March 05, 2016 and estimate to be completed on April 04, 2016 on areas bounded by the following coordinates:        

ASE (Asia Submarine Cable Express) BU3 (Branching Unit 3) Repair-Cable Working Area 

Event Latitude Longtitude
Branching Unit 3 18 degs 21.0620 mins North 119 degs 14.1540 mins East
  18 degs 14.80 mins North 119 degs 12.66 mins East
  18 degs 15.44 mins North 119 degs 10.64 mins East
  18 degs 26.50 mins North 119 degs 14.40 mins East
  18 degs 25.91 mins North 119 degs 16.69 mins East

3. In this connection, all ships/watercrafts transiting along the routes of above mentioned destinations are advised to observe safe distance from the vessel and take necessary precautionary measures at all times.

4. The cooperation of all concerned in effecting the widest dissemination of this information is requested.