MENU

Notice is hereby given to all mariners and other parties concerned that:

1. Reference: Message from Acting Commander, Coast Guard National Capital Region-Central Luzon dated 29 April 2018.

2. The Angel Lazaro & Associates International Consulting Engineers and Architects with office address at L.L. Building, 160 Panay Avenue Corner Edsa, Quezon City was employed by the DPWH to perform a study on Jones Bridge in Binondo-Lawton, Manila and assess its structural integrity in preparation with the most talked about the “Big One” bounded by the following coordinates:

INCLUSIVE DATES

AREA OF COVERAGE

COORDINATES

 

 

29 April- 30 June 2018

 

Jones Bridge, Crossing Pasig River, Binondo Lawton, Manila

Lat 14° 21’ 16.279” N, Long 120° 35’ 01.538” E

 

Lat 14° 21’ 16.016” N, Long 120° 35’ 02.007” E

 

 

3. In this connection, all ships/watercrafts transiting the vicinity of the abovementioned areas are advised to take note of the information and take necessary precautionary measures at all times.

4. The cooperation of all concerned in effecting widest dissemination of this information is requested.

Notice is hereby given to all mariners and other parties concerned that:

1. Reference: Letter from Engineer Florante Soliman Trinav Surveys, Inc dated 27 |April 2018.

2. Trinav Surveys, Inc., a Philippine based company has been contracted by Surestre Properties Inc. to conduct Bathymetry Survey in Manila Bay. The survey will start on 28 April 2018 to 15 May 2018 bounded by the following coordinates:

Point

Latitude

Longitude

1

14° 31’16.66” North

120° 58’46.17 East

2

14° 31’12.21” North

120° 58’23.46” East

3

14° 32’12.06” North

120° 55’31.01” East

4

14° 31’54.19” North

120° 55’24.51” East

5

14° 31’4.05” North

120° 57’53.75” East

6

14° 31’9.46” North

120° 58’44.50” East

 7

 14° 31’12.21” North

120° 58’46.66” East

3. In this connection, all ships/watercrafts transiting the vicinity of the abovementioned areas are advised to take note of the information and take necessary precautionary measures at all times.

4. The cooperation of all concerned in effecting widest dissemination of this information is requested.

Notice is hereby given to all mariners and other parties concerned that:

1. Reference: Message from Commander Coast Guard District Central Visayas dated 24 April 2018.

2. The GEOTECHNICS PHILIPPINES, INC. will conduct Sea Bed Sampling along Mactan Channel from 23 April to 06 May 2018. The activity will be used on the design stage of the CEBU CORDOVA LINK EXPRESSWAY PROJECT before construction stage bounded with the following coordinates:

NAME

LATITUDE

LONGITUDE

1

10° 19’ 42.47”  North

123° 58’ 08.53” East

2

10° 19’ 26.26” North

123° 57’ 53.96” East

3

10° 19’ 17.61” North

123° 57’ 30.14” East

4

10° 19’ 05.13”  North

123° 57’ 12.51” East

5

10° 18’ 55.50” North

123° 56’ 44.35” East

6

10° 18’ 43.00” North

123° 56’ 36.45” East

7

10° 18’ 45.29”  North

123° 56’ 32.05” East

8

10° 18’ 53.01” North

123° 56’ 48.60” East

9

10° 19’ 08.42” North

123° 57’ 08.86” East

10

10° 19’ 13.87”  North

123° 57’ 33.39” East

11

10° 19’ 29.66” North

123° 57’ 50.47” East

12

10° 19’ 38.39” North

123° 58’ 11.30” East

13

10° 19’ 40.39”  North

123° 58’ 09.94” East

14

10° 19’ 27.89” North

123° 57’ 52.25” East

15

10° 19’ 15.71” North

123° 57’ 31.78” East

16

10° 19’ 06.75”  North

123° 57’ 10.64” East

17

10° 18’ 54.26” North

123° 56’ 46.47” East

18

10° 18’ 44.14” North

123° 56’ 34.28” East


3
In this connection, all ships/watercrafts transiting the vicinity of the above-mentioned areas are advised to take note of the information and take necessary precautionary measures at .all times.

4. The cooperation of all concerned in effecting the widest dissemination of this information is requested.

Notice is hereby given to all mariners and other parties concerned that:

1. Reference: Letter from Mr. Ezekiel U. Poso Logistics Manager of Supply Oilfield Services, Inc. dated April 24 2018.

 2. M.V. ENA HABITAT, owned and operated by Eastern Navigation Pte. Ltd and contracted by the Philodrill Corporation, will perform Well Plug and Abandon Campaign at offshore Northwest Palawan starting on May 06, 2018 for approximately two (2) months duration subject to sea and weather permitting. The campaign activities are operating under offshore block Service Contract SC-14 A&B between The Philodrill Corporation and the Department of Energy (DOE) bounded with the following coordinates:

LATITUDE

LONGITUDE

11° 25.817’ North

119° 03.726” East

3In this connection, all ships/watercrafts transiting the vicinity of the above-mentioned areas are advised to take note of the information and take necessary precautionary measures.

4. The cooperation of all concerned in effecting the widest dissemination of this information is requested.

 

Notice is hereby given to all mariners and other parties concerned that:

1. Reference: Message from Commander, Coast Guard District Northern Mindanao dated 19 April 2018.

2. LS Gingoog located at Guanzon Gingoog Misamis Oriental or at Latitude 08 deg 52 mins 10 sec North, Longitude 125 deg 08 mins 00 sec East was successfully RESTORED TO NORMAL OPERATION since 17 April 2018 with light characteristics of FLASHING GREEN EVERY 5 SECS.

3. In this connection, all ships/watercrafts transiting the vicinity of the above-mentioned areas are advised to take note of the information and take necessary precautionary measures at all times.

4. The cooperation of all concerned in effecting widest dissemination of this information is requested.