- Details
- Parent Category: NOTAM
Notice is hereby given to all mariners and other parties concerned that:
1. Reference: Letter from Christine R. Kennaman, Chief Executive Office of SUBSEA Services Incorporated dated 27 February 2020.
2. The Subsea Services Inc. through survey boat MB SEA QUEEN will conduct fender replacement at Chevron Batangas Terminal, Philippines for Chevron Philippines Inc. on 09 March to 09 April 2020 bounded by the following coordinates:
Point |
Latitude |
Longitude |
1 |
13°46.343’ N |
121°1.463’E |
2 |
13°46.122’ N |
121°1.384’E |
3 |
13°46.271’ N |
121°0.972’E |
4 |
13°46.505’ N |
121°1.066’E |
3. In this connection, all ships/watercrafts transiting on the above-mentioned areas are advised to take note of the information and take precautionary measures at all times.
4. The cooperation of all concerned in effecting widest dissemination of this information is requested.
- Details
- Parent Category: NOTAM
Notice is hereby given to all mariners and other parties concerned that:
1. Reference: Letter from Ms. Ruth F. Musa, Compliance Officer Port Agency Services and Ben Line Agencies Philippines Inc. dated 27 February 2020.
2. The cable ship “RESOLUTE” wholly owned by C.S Resolute Inc., a Marshall Island Corporation, will conduct cable installation for 6 months duration on maritime areas bounded by the following coordinates:
Areas of Activities |
Coordinates |
95 NM Northwest of Calayan Island |
Lat 20°52.29’N, Long 117°60.00’E to Lat 20°01.93’N, Long 119°58.39’E |
6 miles away and between Calayan Island and Dalupiri Island |
Lat 20°01.93’N, Long 119°58.39’E to Lat 20°11.64’N, Long 123°48.33’E |
316 NM distance up to Baler landing point |
Lat 20°11.64’N, Long 123°48.33’E to Lat 15°46.11’N, Long 121°33.84’E |
235 NM distance up to San Fernando landing point |
Lat 20°01.93’N, Long 119°58.39’E to Lat 16°35.98’N, Long 120°18.05’E |
3. In this connection, all ships/watercrafts transiting on the above-mentioned areas are advised to take note of the information and take precautionary measures at all times.
4. The cooperation of all concerned in effecting widest dissemination of this information is requested.
- Details
- Parent Category: NOTAM
Notice is hereby given to all mariners and other parties concerned that:
1. Reference: Letter from Acting Commander, Coast Guard District National Capital Region- Central Luzon dated 14 February 2020.
2. The J.H Pajara Construction Corporation with office address at 33 San Rafael corner San Roque St., Barangay Kapitolyo, Pasig City, will conduct construction/repair/improvement of various infrastructure including Local Projects-Pasig River Esplanade (Phase II) from Ayala Bridge to Jones Bridge along Pasig River, Manila City on 24 February 2020 to 19 August 2020.
AREA OF COVERAGE |
COORDINATES |
Vicinity waters off Ayala Bridge to Jones Bridge along Pasig River |
PT 1 Lat 14° 35' 46.58" N, Long 120° 58' 55.32" E |
PT 2 Lat 14° 35' 01" N, Long 120° 58' 55.72" E |
|
PT 3 Lat 14° 35' 45.48" N, Long 120° 58' 52.38" E |
|
PT 4 Lat 14° 35' 44.30" N, Long 120° 58' 53.68" E |
3. In this connection, all ships/watercrafts transiting on the above-mentioned areas are advised to take note of the information and take precautionary measures at all times.
4. The cooperation of all concerned in effecting widest dissemination of this information is requested.
- Details
- Parent Category: NOTAM
Notice is hereby given to all mariners and other parties concerned that:
1. Reference: Philippine Navy cite NOCB-0220-128 dated 26 February 2020.
2. The Philippine Navy vessels PB322, PB351 and PC388 will conduct gunnery exercise as annual basic/combat operational readiness evaluation on the date and maritime areas bounded by the following coordinates:
Vessel |
Date |
Vicinity |
Coordinates |
PB322 and PB351 |
16-18 March 2020 |
9.2 NM W off Maragayap River, Bacnotan, La Union |
Pt A Lat 16°50.493’N, Long 120°02.458’E Pt B Lat 16°42.140’N, Long 120°01.849’E Pt C Lat 16°41.400’N, Long 120°10.139’E Pt D Lat 16°49.423’N, Long 120°10.664’E |
PC388 |
16-18 March 2020 |
7.5 NM NW off Poro pt., San Fernando, La Union |
Pt A Lat 16°50.536’N, Long 120°02.509’E Pt B Lat 16°42.678’N, Long 120°01.928’E Pt C Lat 16°41.314’N, Long 120°10.145’E Pt D Lat 16°49.284’N, Long 120°10.615’E |
3. In this connection, all ships/watercrafts transiting on the above-mentioned areas on the said date are advised to take note of the information and take precautionary measures at all times.
4. The cooperation of all concerned in effecting widest dissemination of this information is requested.
- Details
- Parent Category: NOTAM
Notice is hereby given to all mariners and other parties concerned that:
1. Reference: Letter from Acting Commander, Coast Guard District National Capital Region- Central Luzon dated 14 February 2020.
2. The Newbig Four J Construction Incorporation with office address at 21 Mustang St., Rancho Estate I Marikina City, will conduct construction/repair/improvement of various infrastructure including Local Projects-Pasig River Esplanade (Phase I) from Ayala Bridge to Jones Bridge along Pasig River, Manila City from 14 January 2020 to 12 July 2020.
AREA OF COVERAGE |
Proposed Structure |
COORDINATES |
Vicinity waters off Ayala Bridge to Jones Bridge along Pasig River |
View Deck Post Office Area |
PT 1 Lat 14° 35' 46.00" N, Long 120° 58' 42.63" E |
PT 2 Lat 14° 35' 45.67" N, Long 120° 58' 42.71" E |
||
PT 3 Lat 14° 35' 46.77" N, Long 120° 58' 44.95" E |
||
PT 4 Lat 14° 35' 46.34" N, Long 120° 58' 45.15" E |
||
View Deck Lawton Ferry Station |
PT 1 Lat 14° 35' 45.67" N, Long 120° 58' 52.55" E |
|
PT 2 Lat 14° 35' 45.34" N, Long 120° 58' 52.38" E |
||
PT 3 Lat 14° 35' 44.88" N, Long 120° 58' 53.29" E |
||
PT 4 Lat 14° 35' 44.74" N, Long 120° 58' 53.16" E |
||
View Deck Arroceros Park |
PT 1 Lat 14° 35' 41.07" N, Long 120° 58' 56.34" E |
|
PT 2 Lat 14° 35' 40.93" N, Long 120° 58' 56.13" E |
||
PT 3 Lat 14° 35' 39.45" N, Long 120° 58' 57.52" E |
||
PT 4 Lat 14° 35' 39.22" N, Long 120° 58' 57.29" E |
3. In this connection, all ships/watercrafts transiting on the above-mentioned areas are advised to take note of the information and take precautionary measures at all times.
4. The cooperation of all concerned in effecting widest dissemination of this information is requested.