- Details
- Parent Category: NOTAM
Notice is hereby given to all mariners and other parties concerned that:
1. Reference: Radio message from Commander, Maritime Safety Services Command dated 15 February 2020.
2.LS LANGOY located at Langoy Island, Barangay Dagman, Araceli, Palawan; Latitude 10° 29’ 42” North, Longitude 119° 59’ 06” East with characteristic of flashing white light every 10 seconds is hereby OPERATING as of 29 January 2020.
3. In this connection, all ships/watercrafts transiting vicinity waters of above-mentioned area are advised to take note of the information.
4. The cooperation of all concerned in effecting widest dissemination of this information is requested.
- Details
- Parent Category: NOTAM
Notice is hereby given to all mariners and other parties concerned that:
1. References: a) Letter from Mr. Rogelio B. Sobremonte, President, of TDG Ship
Management, Inc. dated 07 February 2020.
b) PCG NOTAM Nr.016-2020 dated 27 January 2020.
2. The ongoing installation and repair of additional PLDT submarine cable segments linking Luzon and Visayas areas such as Sagnay to Virac 2 and Siquijor to Laya is extended until 08 February 2020 and 13 February 2020 respectively.
3. In this connection, all ships/watercrafts transiting on the above-mentioned areas on the said date are advised to take note of the information and take precautionary measures at all times.
4. The cooperation of all concerned in effecting widest dissemination of this information is requested.
- Details
- Parent Category: NOTAM
Notice is hereby given to all mariners and other parties concerned that:
1. Reference: Letter from Ms. Ruth F. Musa, Compliance Officer Port Agency Services and Ben Line Agencies Philippines Inc. dated 10 February 2020.
2. The MBca “Super Mario Island Cruise” will conduct a marine inshore survey for the project Luzon LNG Import Terminal at Batangas Bay on 20 February 2020 with a duration of 30 days.
3. In this connection, all ships/watercrafts transiting on the above-mentioned areas on the said dateare advised to take note of the information and takeprecautionary measures at all times.
4. The cooperation of all concerned in effecting widest dissemination of thisinformation is requested.
- Details
- Parent Category: NOTAM
Notice is hereby given to all mariners and other parties concerned that:
1. Reference: Philippine Navy cite NOCB-0220-051 dated 11 February 2020.
2. Philippine Navy vessel PC372 will conduct first quarter test firing of her naval guns on the date and maritime areas bounded by the following coordinates:
Vessel | Date | Vicinity | Coordinates |
BRP ALFREDO PECKSON (PC372) | 23 March 2020 | 3.1 NM SE off Pangumbacan pt., Camotes Island, Cebu |
Pt A Lat 10°32.000’N, Long 24°15.000’E Pt B Lat 10°32.000’N, Long 124°25.000’E Pt C Lat 10°22.662’N, Long 124°25.115’E Pt D Lat 10°22.720’N, Long 124°15.182’E |
3. In this connection, all ships/watercrafts transiting on the above-mentioned areas on the said date are advised to take note of the information and take precautionary measures at all times.
4. The cooperation of all concerned in effecting widest dissemination of this information is requested.
- Details
- Parent Category: NOTAM
Notice is hereby given to all mariners and other parties concerned that:
1. References: a) Letter from Mr. Rogelio B. Sobremonte, President, of TDG Ship
Management, Inc.dated12 February 2020.
b) PCG NOTAM Nr.030-2020 dated 07 February 2020.
2. The ongoing installation and repair of additional PLDT submarine cable segments linking Luzon and Visayas areas such as Siquijor to Laya and Calindagan to Siquijor are on 09 to 15 February 2020 and 15 to 21 February 2020 respectively.
3. In this connection, all ships/watercrafts transiting on the above-mentioned areas on the said dateare advised to take note of the information and takeprecautionary measures at all times.
4. The cooperation of all concerned in effecting widest dissemination of thisinformation is requested.